Bathroom renovation for Singapore homes

Bathroom Renovation Singapore

Coordinate bathroom hacking, waterproofing, tiling, plumbing and sanitary installation works under one clear renovation scope.

Completed RenoExpert bathroom renovation with fitted vanity and mirror

Completed bathroomRenoExpert project photography

Residential renovation enquiries

Who This Service Is For

RenoExpert can coordinate bathroom renovation scopes for HDB resale homes, condominiums and other residential properties, subject to the proposed work and actual site conditions.

Coordinated bathroom works

Bathroom Renovation Services

Build the renovation scope around the existing bathroom, selected finishes and the plumbing, fitting and installation work required.

01

Hacking & Dismantling

Remove agreed existing tiles, sanitary fittings, vanity units and finishes before new renovation work begins.

02

Waterproofing

Coordinate substrate preparation and waterproofing within the agreed bathroom renovation scope.

03

Floor & Wall Tiling

Plan tile setting, floor falls, drainage positions and finishing around the bathroom layout.

04

Plumbing Works

Coordinate the agreed water and drainage points for the basin, toilet and shower area.

05

Sanitary Installation

Install confirmed sanitary fittings after the relevant tiling and plumbing work is ready.

06

Basin & Vanity

Coordinate basin and vanity positioning with plumbing points, wall finishes and available circulation space.

07

Toilet & Shower Fittings

Plan toilet bowl and shower fitting installation as part of the agreed bathroom works.

08

Electrical & Finishing

Coordinate lighting or electrical points and applicable painting or finishing work within the renovation scope.

Confirm requirements before work

Planning an HDB Bathroom Renovation

HDB requirements depend on the proposed renovation scope. Where approval or an eligible contractor is required, this should be confirmed before work begins.

For an HDB bathroom or toilet renovation, confirm the applicable requirements for hacking, waterproofing, plumbing alterations and floor or wall finishes before agreeing the work sequence. Homeowners should review the current scope-specific requirements in the official HDB renovation guidance.

Complete 2-Bathroom Package

2-Bathroom Resale Renovation Package

$8,999

This $8,999 package is based on a two-bathroom renovation scope covering hacking, waterproofing, screeding, tiling, plumbing, sanitary installation and finishing works.

The final quotation may vary after the actual site condition and confirmed scope are assessed. Relevant factors can include additional hacking, substrate condition, waterproofing requirements, plumbing relocation, electrical changes, unusual tile sizes or laying patterns, concealed damage and additional owner-requested work.

Professional Services

  • Design consultation and space planning
  • 3D visual perspective presentation
  • Materials and colour selection
  • Project management and site supervision

Hacking & Dismantling Works

  • Hack existing floor and wall tiles in two bathrooms
  • Hack the two existing toilet entrance kerbs at the master bathroom and common bathroom
  • Remove existing toilet bowls, basins and bathroom accessories in both bathrooms

Masonry & Waterproofing Works

  • Supply labour and materials to install waterproof membrane in two bathrooms
  • Supply labour and materials for cement screeding in two bathrooms
  • Lay homogeneous floor tiles in two bathrooms — owner supplies tiles
  • Lay ceramic wall tiles in two bathrooms — owner supplies tiles

Floor and wall tiles are supplied by the homeowner.

Plumbing & Sanitary Installation

  • Supply labour and materials to install stainless-steel piping for two bathrooms
  • Install toilet bowls in both bathrooms
  • Install two instant water heaters
  • Install basins and taps in both bathrooms
  • Install spray guns in both bathrooms
  • Install bathroom accessories in both bathrooms

Toilet bowls, basins, taps, shower sets, accessories and sanitary fittings are supplied by the homeowner. The items listed above describe the included installation work.

Miscellaneous Works

  • Supply labour and materials to install slide and swing doors in both bathrooms
  • Corrugated-board protection
  • Renovation debris clearing
  • Haulage of building materials
  • General washing and chemical washing

Owner-supplied items: Floor and wall tiles, toilet bowls, basins, taps, shower sets, accessories and sanitary fittings.

RenoExpert is not GST registered, so GST is not added to the quotation.

Request $8,999 Package QuoteSee our 2026 bathroom renovation cost guide

Compare the confirmed scope

What Your Bathroom Renovation Quotation Should State

A clear quotation helps homeowners compare the work being proposed, not only the total price.

Read the Bathroom Renovation Cost Singapore guide
  • Hacking, dismantling and debris-disposal scope
  • Waterproofing and substrate-preparation scope
  • Tiling scope and tile-supply responsibility
  • Plumbing work and any agreed point changes
  • Sanitary fitting installation and owner-supplied items
  • Electrical work, where applicable
  • Exclusions and variation items, where applicable

Plan the wet works carefully

Waterproofing, Drainage & Tiling

These connected works should be considered together so the new bathroom finishes suit the layout, drainage positions and selected sanitary fittings. Review the connected preparation and installation considerations for bathroom floor and wall tiling.

01

Prepare the Substrate

Review and prepare the relevant surfaces after the agreed removal work and before waterproofing and tile installation.

02

Coordinate Waterproofing

Include the required waterproofing within the confirmed bathroom scope before the relevant finishes are installed.

03

Plan Falls & Drainage

Consider floor levels, falls and drainage positions alongside the shower area and bathroom layout.

04

Finish Around Fittings

Coordinate wall and floor tiling with the basin, toilet, shower fittings and other selected sanitary items.

From existing bathroom to handover

Bathroom Renovation Process

  1. 01

    Share Floor Plan or Photos

    Send your bathroom photos, floor plan and the renovation works you are considering.

  2. 02

    Site Visit & Scope Review

    Review the existing bathroom, site conditions and required work scope.

  3. 03

    Quotation & Material Selection

    Confirm the quotation, tile selections, fittings and coordinated renovation details.

  4. 04

    Renovation Works

    Carry out the agreed hacking, waterproofing, tiling and plumbing sequence.

  5. 05

    Installation & Handover

    Complete sanitary installation, finishing checks and the agreed handover.

Teban Gardens project evidence

Bathroom Renovation from Before to Completion

The Teban Gardens project included two bathrooms, with actual photographs documenting the original condition, installation work and completed bathroom.

View the Teban Gardens bathroom renovation

Why RenoExpert

Clear Coordination for Bathroom Renovation

Keep the quotation and connected renovation trades within one clearly agreed project scope.

01

Direct Contractor

Work directly with the renovation team coordinating your bathroom project.

02

Clear Quotation

Understand the agreed work scope and pricing before renovation begins.

03

Coordinated Trades

Hacking, waterproofing, tiling, plumbing and installation coordinated under one project scope.

04

1-Year Workmanship Warranty

1-year workmanship warranty for the confirmed bathroom renovation scope.

Common questions

Bathroom Renovation FAQ

What is included in a bathroom renovation?

The agreed scope can include hacking and dismantling, substrate preparation, waterproofing, floor and wall tiling, plumbing, sanitary fitting installation, vanity work, electrical coordination and applicable finishing. The quotation should clearly state what is included for your bathroom.

How much does bathroom renovation cost in Singapore?

The cost depends on the existing bathroom condition, hacking requirements, tile selection, plumbing changes, sanitary fittings and the overall work scope. RenoExpert can prepare a project-specific quotation after reviewing the bathroom and requirements.

Is waterproofing included?

Waterproofing can be included when it forms part of the agreed renovation scope. Its extent should be confirmed in the quotation together with the hacking, preparation and tiling works.

Can I overlay tiles instead of hacking?

Whether an overlay approach is suitable depends on the existing tile condition, levels, drainage, doors, fittings and planned work. The bathroom should be assessed before confirming the appropriate approach.

Can you coordinate an HDB toilet or bathroom renovation?

RenoExpert can coordinate an agreed HDB toilet or bathroom renovation scope, subject to the proposed work and site conditions. HDB requirements must be confirmed before work begins, including where approval or an eligible contractor is required.

Can I send bathroom photos or a floor plan for quotation?

Yes. Send current bathroom photos, a floor plan and your renovation requirements through WhatsApp for an initial review and discussion of the next step.

Start with photos or a floor plan

Planning a Bathroom Renovation?

For a more accurate quotation, share the property type, number of bathrooms, photos or floor plan, hacking or overlay preference if known, preferred fittings and expected renovation period.